| Customization: | Available |
|---|---|
| After-sales Service: | Video Technical Support, Online Support, Spare PAR |
| Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

MWF300 crawler water well drilling rig | |||
Drilling Depth (Max.) | 300 m | Swing Torque | 6500 / 3250 Nm |
Hole Diameter | Φ105 - Φ325 mm | Penetration Efficiency | 10 - 35 m/h |
Using Air Pressure | 1.2 - 3.5 MPa | Lifting Capacity | 1.1 T |
Air Consumption | 16 - 55 m³/min | Engine Power | 73 kW (Yuchai, optional) |
One-time Advance Length | 6.6 m | Walking Speed | 2.5 km/h |
Drill Pipe Length | 3 m / 6 m | Climbing Angle (Max.) | 21° |
Drill Pipe Diameter | 89 / 102 mm | High Leg Stroke | 1.5 m |
Rig Lifting Force | 15 T | Width of Loading | 2600 mm |
Fast Feeding Speed | 55 m/min | Overall Dimensions (L×W×H) | 5780 × 1800 × 2400 mm |
Rapid Lifting Speed | 30 m/min | Machine Weight | 7.2 T |
Swing Speed | 80 / 160 r/min | Hoisting Force of Winch | Medium / High Pressure Series |
Engine Brand | Yuchai Engine | ||












