Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150

Product Details
Customization: Available
After-sales Service: Service Provided:Video Technical Support
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
Experienced Team
The supplier has 8 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (20)
  • Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
  • Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
  • Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
  • Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
  • Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
  • Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
Find Similar Products

Basic Info.

Model NO.
MWGF150
Certification
ISO 9001:2000
Condition
New
Drill Hole Diameter
150-400mm
Drill Hole Depth
80m
Drilling Way
Impactor
Type
Crawler
Usage
Solar Hole Drilling
Crawler Type
Steel
Weight
5.01 T
Outer Dimension
5.2*2.0*2.55m
Drilling Depth
80m
Walking Speed
3km/H
One-Time Feed Length
3m
Maximum Torque
3800/5500n.M
Rotary Speed (High Speed)
85r/Min
Rotary Speed (Low Speed)
40r/M
Chassis Ground Clearance
33cm
Specification
5200*2000*2550mm
Trademark
Dminingwell
Origin
Zhejiang
Production Capacity
20/Month

Product Description

MWGF 150 Multifunctional Photovoltaic Drilling Rig

Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
Technical Paraments MWGF150
Total Weight 5.01 T
Outer Dimension 5.2*2.0*2.55m
Drilling Depth 80m
Walking Speed 3km/h
One-time Feed Length 3m
Maximum Torque 3800/5500N.m
Rotary Speed (High Speed) 85r/min
Rotary Speed (Low Speed) 40r/m
Chassis Ground Clearance 33cm
     MWGF150 multi-functional photovoltaic drilling rig is a multi-purpose drilling rig integrating photovoltaic piling, foundation piling, blasting hole drilling, and down-the-hole drilling. It adopts a new single-rib high-strength crawler and an excavator travel motor, which offers the advantages of strong climbing ability, hard to be damaged, and long service life.
     The drilling rig is equipped with Yuchai 75KW turbocharged diesel engine, and adopts new hydraulic technology with low air consumption. The rotary gearbox adopts dual motors and high-torque gearbox, which is convenient to move and compact structure. At the same time, the sliding frame has the function of expansion and contraction compensation. When drilling, the sliding frame supports the ground, and the drilling performance is stable. The diameter of photovoltaic piling can reach 150mm-400mm, and the diameter of DTH hammer construction can reach 100mm-350mm. The rig adopts a high-torque motor. The drilling rig has the characteristics of flexible maneuverability, strong climbing ability, suitable for rough site operations, convenient perforation and displacement, high drilling efficiency, easy maintenance and high reliability. It is an ideal multi-purpose drilling rig for photovoltaic piling, mining, road, water conservancy, power station and other construction facilities

Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150
Crawler 150-400mm Dminingwell Photovoltaic Foundation Drilling Machine Mine Drill Pill Rig Mwgf150

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier